Method to extend Hymotion Battery by 25%
![]() |
| | Tweet | LinkBack | Thread Tools |
| | #1 |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | 120 A123 M1 cells configured for 13.4V (about 1kwhr) could power a 12V inverter in your trunk, and then provide the 700 Watts required by the chargers in the Hymotion battery pack while you are driving the car. This would pump about 1 Kwhr into the Hymotion battery in the first hour, extending the usuable amount of kwhr from the present 3kwhr to 4kwhr. Can the Hymotion chargers work while while the pack is being used? Cost- Buying 36v Dewalt battery packs (10 cells per Pack) off of Ebay would cost between 960 and 1200$. So increasing the cost of the whole system by 10% would improve the overall system by 25% Charging- These cells require an inteligent charging system that load levels every cell at the end of each charging cycle. This charger would have to be designed for the 13.4v system. This by the way is why the Hymotion pack does not allow the hybrid system to charge this battery. Ron |
| | |
| | #2 |
| Sapphire of the Blue Sky Join Date: Apr 2007 Location: Virginia
Posts: 1,531
My Car: 2007 Prius Model: N/A Package: #2 Thanks: 11
Thanked 69 Times in 59 Posts
Friends: 0 | Uhh... Why not just connect everything together without additional recharging/inverters... |
| | |
| | #3 | |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | Quote:
Good question. The Hymotion battery pack comes with it's own chargers, 3 of them. So if you wanted to add to the pack you would have to integrate another charger some how. Doing the 12v pack and going through an inverter allows you to disconnect the whole thing and take it out, Leaving the Hymotion system intact and uncompromised. Another way to do this would be too use a 36V UPS. Then you could just hook up DEwalt 36v battery packs to the UPS, so your packaging is taken care of sort of, and you can recharge the Dewalt packs with their own dewalt chargers (4 to 12 of them). Tahnks- Ron | |
| | |
| | #4 |
| Senior Member Join Date: Apr 2006
Posts: 1,157
My Car: Model: Package: Thanks: 0
Thanked 3 Times in 2 Posts
Friends: 3 | Hymotions system has a charge lockout so you can't drive the car while it is charging. |
| | |
| | #5 |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | Thanks for that info. Too bad, I can't think of any reason why that would be necessary. Guess you could charge the system whenever you are out of the car shopping or whatever. Ron |
| | |
| | #6 |
| Junior Member Join Date: Sep 2008 Location: St. Louis, Missouri
Posts: 3
My Car: 2008 Prius Model: Package: #6 Touring Thanks: 0
Thanked 0 Times in 0 Posts
Friends: 0 | I like the concept but can this be done with "off the rack" products or do I need to modify technology? If I buy the Dewalt Packs, the chargers and a 36 Volt UPS, how do I get the packs to power the inverter or UPS since they are structurally desinged for Dewalt tools? The ideal system for me would be set up to charge the Dewalt cells from the AC outlet and then have the subsystem charge the Hymotion system when the car is not running. |
| | |
| | #7 |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | Chargeing these batteries is not trivial. They require a sofisticated charger. Standard UPS's use female spade connectors to connect to gelcel lead acid batteries. You would have to change those to male spade connectors, probably 10 guage ones. You would have to package the Dewalt battery packs and make up a cable harness that would match the individually packaged battery packs. Just push the spade connectors into each battery pack. You may want to come up with some way to secure the spade connectors to the packaging structure (and this structure should restrain the battery packs also) so they don't try to back out of the battery packs. The whole package needs to disasemble quickly so the Packs can be taken out and charged individually in there own chargers. An interresting job for amature and expert alike! Ron |
| | |
| | #8 |
| Senior Member Join Date: Apr 2008 Location: Canada
Posts: 334
My Car: 2008 Prius Model: Package: N/A Thanks: 2
Thanked 1 Time in 1 Post
Friends: 0 | If those Dewalt batteries were deep-cycled at each use (from 100% to 0% back to 100%) how long will they last? 500-700 cycles? To make them last, wouldn't you have to find a way to use the 20-80% range like the Prius battery? |
| | |
| | #9 |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | If you believe A123 their M1 cells will last several thousand cycles in full cycle mode. Even then they will retain 80% of capacity. Keeping them above 20% charge will help them do even better. These cells have two great advantages over previous generation cells, the first being long life. The other is huge discharge/recharge capability. Their middling capacity and difficult recharge habits has made it difficult to use the latter advantage of huge current capabilities, except for the electric motorcycle dragster that uses these cells. A123 has promised their new cells being tested by GM for the Volt has far more capacity with the same low internal resistance (.01 ohm). We can only hope for that and some moderation in price! Ron |
| | |
| | #10 |
| Phev's Plus Home Solar power1 Join Date: Nov 2006 Location: Green Valley AZ.
Posts: 28
My Car: 2004 Prius Model: Package: #9 Thanks: 3
Thanked 1 Time in 1 Post
Friends: 0 | I forgot to mention that Hymotion is using a 5KWR battery pack, but is only using 3KWH of that capacity. This means that they are leaving 40% of capacity on the low end. So figure 40%-100% use of capacity. Charging to 100% capacity will not shorten life because it is done very slowly and carrefully with internal charging circuits. This battery pack will be rediculously under stressed, as it is capable of putting out over 90KW but will never have to provide more than 22 KW. You could charge this pack to 90% of full charge in as little as 5 min. It will take over 6 hours to charge this pack. Hey Hymotion, how about adding a 220V charger so we can do a full charge in 1 hour at least! Thanks- Ron |
| | |
![]() |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Possible to Extend Driver Seat??? | ITGuy | Gen II Prius Main Forum | 18 | 08-27-2009 04:44 PM |
| Hymotion Plug-in a123 battery pack available for consumer purchase | pelewis2 | Prius, Hybrid, EV and Alt-Fuel News | 92 | 05-26-2008 08:45 PM |
| Reconditioning Can Extend Hybrid Battery Life | zenMachine | Gen II Prius Technical Discussion | 0 | 09-24-2007 10:26 PM |
| Extend the Warranty or Not? | berryman | Gen II Prius Main Forum | 27 | 04-16-2006 08:41 AM |
| Extend the Warrant or Not??? | berryman | Gen II Prius Care, Maintenance and Troubleshooting | 3 | 04-07-2006 02:37 PM |
| Bookmarks |
« Previous Thread
|
Next Thread »
| Thread Tools | |
| |