Ground mount may require a different permit even if you don't interconnect. My ground mount system needed a permit to be a legal structure- it is technically a shed; a 'non-dwelling outbuilding feature' or some such. It was a very easy permit to get in my little township, but that'll be different everywhere. This was entirely separate from the customer-generator contract we struck with the utility for electrical interconnection.