https://news.gov.bc.ca/releases/2026ECS0041-000855 From Jul 22, 2026: This is after it tripled its size last year. From Jan 14, 2026: BC Hydro surpasses 800 EV charging ports and unveils its highest-powered charger in Burnaby
The urban charging hubs are all 180kW split units (so 90kW each if two vehicles are charging). This is much better than the single or twinned 50kW and 100kW units they have within the major city centres. The 50kW and 100kW are 100A and 200A/500V units respectively. I don't know the specs of the 180kW units (forgot to take a look). The 350kW and 400kW are obviously 1000V units. (from ABB and Alpitronic respectively)
IIRC that's pretty much part of vancouver, right? Seems I saw the glow of flaring at what was most likely from a refinery many years ago in the area.